Grid Company – Renewable Integration, Austria

Grid Company

E V N

Critical Infrastructure
  • >14 years in continuous operation (COD in 2010)
  • renewable integration
  • Deviation settlement mechanism (DSM)
Renowned local utility adds CellCube LDES as part of its testbed for testing different types of wind turbines and use cases within microgrids ranging from residential to C&I level

Facts

Market Sector: Critical Infrastructure
Location: Lichtenegg, Austria
CellCube Product: 1 x CellCube FB 10-100
Key Applications: renewable integration, DSM
Rated Power / Capacity: 10 kW / 100kWh